CIS has teamed up with Wagenborg Foxdrill in Kazakhstan to install 38 conductors using a mobile crane and a purpose-designed land frame. This enables the conductor to be held perfectly vertically while the hydraulic hammer drives it into position. There is a significant cost saving as a drilling rig is not required.

Also, this method of installation allows the entire operation to be undertaken off the critical field development path.